Isleton Water Distribution System

Project Title and Location: Isleton Water Distribution System
Project Owner: California American Water
Performance Period and Duration: 2014-2015
Project Role: Prime Contractor
Scope and Complexity:

California American Water (CAW) Isleton system provides drinking water and fire flow distribution to customers along the Sacramento River. The existing 8” water main along First Street, between A and B Streets was determined by the U.S. Army Corps of Engineers, Sacramento District (USACE Sacramento District) to be within the levee profile. CAW intends to abandon the main in-place on First Street between A and B Streets. In addition, depending on the consultant’s communications with the USACE Sacramento District and other regulatory agencies, it may be necessary for CAW to abandon additional piping along First Street. New piping system and connections will be designed to service those customers affected by the project.

Veridico scope includes project management, design oversight, permitting, coordination with various federal, state and local regulatory agencies and providing support for stakeholder outreach.